2.1.1 Pre-Design Studies, Detailed Design And Supervision Services (EXPIRED)

Kutse osalemise huvist teatamiseks

Üldteave

Tonga
   TO-MOH-449646-CS-QCBS
   Nov. 14, 2024
Nov. 25, 2024
  
Ministry of Health
   Inglise keel
   Muud
   avaldatud: Nov. 14, 2024

Kontaktandmed

   Semisi Fukofuka
Ministry of Health
Ministry of Health, Taufa'ahau Rd, Tofoa, Tonga
Tonga
   +676 779 8614
   Klõpsake siia

Projektid

Tsiviilehitustööde nõustamisteenused

Additional resources

Kokkuvõte

      

notice_summary_english: Detailed Design & Construction Supervision Services (DnS) for Tonga North Islands Group Healthcare Facilities
Reference No: TO-MOH-449646-CS-QCBS
The Ministry of Health (MoH) of the Kingdom of Tonga is expected to receive financing from the World Bank toward the cost of the Health Enhancement and Resiliency in Tonga Project (HEART) and intends to apply part of the proceeds for consulting services.
The consulting services (“the Services”) include the “Detailed Design & Supervision Services for Tonga North Islands Group Healthcare Facilities” to perform the following tasks in 3 Phases, but not limited to:
PHASE 1: Pre-Design Assessments & Studies for Northern Islands (Lump-Sum, 12 Months)
Master Planning 7+ hectares of the Prince Wellington Ngu Hospital (PWNH) site for the next 10 years of development;
Performing rapid and detailed assessments of 24 existing buildings at PWNH;
Preparing Environmental and Social due diligence documents for Project Component 2;
Assessing, planning, and preparing medical equipment/supply specifications and bid documents for PWNH and Northern Island CHCs and Nursing Clinics in Vava’u and Niua Island Group (6 facilities);
Assessing ICT and digital connectivity for PWNH and Northern Island CHCs and Nursing Clinic in Vava’u and Niua Island Group (6 facilities and including Vaiola Hospital in Nuku’alofa);
PHASE 2: Detailed Design of PWNH Hospital Facility (Lump-Sum, 15 months)
Providing detailed architectural and engineering studies, design, costings, plan, and prepare bid documents for a new 3600sqm hospital and new medical staff quarters at PWNH & the upgrade, retrofit, and/or strengthening of select existing buildings at PWNH;
Preparing Operations & Maintenance plans;
Providing Procurement Support;
PHASE 3: Construction Supervision and Monitoring of PWNH facility (Time-Based, not to exceed a maximum, 24 months)
Providing construction supervision and monitoring services for the development of PWNH.
The total level

Originaaltekst


More information: Klõpsake siia
Pange tähele, et see teade on ainult teile teadmiseks.
Teeme oma parima, et tagada veebisaidil kõige täpsemat ja värskemat teavet, aga me ei saa garanteerida vigade puudumist kogu teabes.
Kui teil on selle teate uuendamise/parandamise osas ettepanekuid, siis palun andke meile teada.